CONTRACT NO.: C0918R
CONTRACT NAME: Design/Build Bus Washer Project at Divisions 1 & 2
PRE-BID CONFERENCE:
Metro - Tuesday, July 21, 2009 @ 10:00 a.m. (Pacific Time)
Board Overflow Conference Room, 3rd Floor
One Gateway Plaza, Los Angeles, CA 90012
BID DUE DATE:
Metro - Monday, August 24, 2009 @ 2:30 p.m. (Pacific Time)
One Gateway Plaza, 12th Floor
Los Angeles, CA 90012
COST OF DOCUMENTS:
The non-refundable price for the complete IFB documents is $25 when picked up at
the above address; or $35 if documents are to be mailed. Requests must be accompanied by
payment to Metro in the form of a money order, a company check, a cashier's check, or a
certified check. Personal checks are not acceptable forms of payment.
BONDS: 10% - Bid Guarantee; 100% Performance and Payment Bonds Upon Award of Contract
LICENSE: "A" General Engineering Contractor or
"B" General Building Contractor or
Voluntary Anticipated Levels of Participation (VALP) Goal:
MBE 10% Voluntary Levels of Participation
WBE 2% Voluntary Levels of Participation
WORK DESCRIPTION: To perform a complete design, construction and construction management
work of Bus Wash Project for Division 1 and Division 2. The purpose of this project is to refurbish
one existing bus wash facility (base) and one new bus wash facility (Options 1, 2 & 3) at Division 1
and refurbish an existing bus wash facility at Division 2 (options 4 & 5).
PAYMENT OF PREVAILING WAGES REQUIRED BY Metro
PROJECT ESTIMATE: BETWEEN $1,000,000 AND $5,000,000
PROJECT DURATION: 240 days after Notice to Proceed
LIQUIDATED DAMAGES: $600 per day for any unexcused contractor delay
AWARD: Metro will award a contract to the lowest responsible bidder.
For further information contact Brian P. Mahaffey, Senior Contract Administrator, at:
Phone: (213) 922-7327 or Fax: (213) 922-3883
News and commentary in public transportation, and the latest job postings and solicitations.