CONTRACT NO.: C0918
CONTRACT NAME: Bus Washer Project at Divisions 1 & 2
PRE-BID CONFERENCE:
Tuesday, Oct. 7, 2008 @ 10:00 a.m. (Pacific Time)
Metro - Board Overflow Conference Room, 3rd Floor
One Gateway Plaza, Los Angeles, CA 90012
BID DUE DATE:
Monday, Oct. 20, 2008 @ 2:30 p.m. (Pacific Time)
Metro - One Gateway Plaza, 12th Floor
Los Angeles, CA 90012
COST OF DOCUMENTS:
The non-refundable price for the complete IFB documents is $25.00 when picked up at
the above address; or $35.00 if documents are to be mailed. Requests must be accompanied by
payment to Metro in the form of a money order, a company check, a cashier's check, or a certified
check. Personal checks are not acceptable forms of payment.
BONDS: 10% - Bid Guarantee; 100% Performance and Payment Bonds Upon Award of Contract
LICENSE: "A" General Engineering Contractor or
"B" General Building Contractor or
"C-12" Earthwork and Paving Contractor
Voluntary Anticipated Levels of Participation (VALP)
MBE GOAL 10%
WBE GOAL 10%
WORK DESCRIPTION: To perform a complete design, construction and construction management
work of Bus Wash Project for Division 1 and Division 2. The Project is to provide one additional
bus wash facility and refurbish one existing bus wash facility at Division 1 in order to reduce the
time to wash the buses. The refurbished bus wash will have the same criteria as the new bus wash.
Also, the Project includes refurbishing an existing bus wash at Division 2.
PAYMENT OF PREVAILING WAGES REQUIRED BY Metro
PROJECT ESTIMATE: BETWEEN $1,000,000 AND $5,000,000
PROJECT DURATION: 240 days after Notice to Proceed
LIQUIDATED DAMAGES: $600 per day for any unexcused contractor delay
AWARD: Metro will award a contract to the lowest responsible bidder.
For further information contact Brian P. Mahaffey, Senior Contract Administrator at:
Phone: (213) 922-7327 or Fax: (213) 922-3883
News and commentary in public transportation, and the latest job postings and solicitations.